---
title: "Amateur-Built Cyclotrons: a Census of 27 Documented Machines · Cyclotron Info"
canonical: https://cyclotroninfo.com/builds/
description: "Every documented amateur and school cyclotron since 1947, home-built or homemade: which reached beam, which stalled, what they cost and how long they took, with specs, status and sources for each."
generated: 2026-11-22
note: "Markdown rendering of the canonical HTML page, generated at build for AI assistants and text tools. Figures and interactive elements are described, not reproduced. On Design Guide rules the source quote, this site's paraphrase and this site's editorial note are labelled separately and must not be conflated."
licence: "Datasets CC BY 4.0, census snapshot CC BY-NC 4.0 (https://cyclotroninfo.com/data/); cite as Cyclotron Info, cyclotroninfo.com"
---
# Amateur Builds

This is a census of documented amateur cyclotrons: machines designed and built by individuals, high-school teams, or small undergraduate groups outside professional accelerator programs. An entry qualifies if the build itself is documented — a project site, thesis, conference paper, or credible press account — not merely rumored. Design studies count when they left a public record; unverifiable claims are noted as such.

Few of these projects reach beam, and the reasons repeat across seven decades: a cyclotron demands a large and carefully shaped magnet, high vacuum, a kilovolt-level RF resonator, a working ion source, and diagnostics — every subsystem at near-professional standard before anything at all happens. Symmetry's report on the 2010 amateur cyclotron conference put the typical build at two to three years, and quoted Fred Niell's estimate of the parts and services, bought new and not counting the builder's time, at about $125,000 (Symmetry, Aug 2010), which is why nearly every successful machine leans on donated magnets, surplus hardware, and patient scrounging. The entries below are presented in a uniform format, grouped by what the record shows each machine did — operating today, ran and stopped, still building, stalled, or never documented past the build — and chronological within each group, with every claim traceable to the linked sources.

27 documented projects · 8 with a demonstrated or routinely operated beam.

Plotted as a timeline, the census tells its story at a glance: a cluster of school builds in the postwar decades, then a silence of more than twenty years before the renaissance that began in the 1990s and has not slowed since.

[Figure, drawn on the page: Timeline of documented amateur cyclotron projects from 1947 to the present, one row per machine. Each row links to the full entry below.]

*Figure caption:* Documented amateur and school cyclotron projects, from start year to first beam or last documented activity (dot = single documented year; arrow = ongoing). Bar colour marks each project's documented outcome, keyed above — cool for the machines that reached beam, warm for those that have not, grey where the record does not say; spans for entries the census dates with “c.” are approximate. Hover a row for details, or select it to jump to the full entry below.

## What the census teaches

27 projects is a small evidence base, censored in a known direction: a build that was never written up never entered, so failure is undercounted here. Four patterns survive that caveat.

**First beam takes one to six years.** 7 of the 8 machines that reached beam date both the start of work and the first beam, and the gap runs from 1 year to 6. The short end belongs to the home builds — both Niell machines and the [Mullins Cyclotron](https://cyclotroninfo.com/builds/#mullins-2017) went from first work to observed beam in about a year — while the [Rutgers 9-inch](https://cyclotroninfo.com/builds/#rutgers-9) took four years and [Houghton](https://cyclotroninfo.com/builds/#houghton-2003) six. The two-to-three-year estimate from the 2010 amateur conference (Symmetry, Aug 2010) sits inside that spread, not at its edge.

**The magnet's provenance does not pick the winners.** 4 of the 8 machines that reached beam wound their own magnets from raw steel and wire; the rest ran on donated, surplus, laboratory, or repurposed historic iron, and the stalled projects divide roughly the same way. On this record, scavenging a magnet saves money and months; it does not decide whether beam happens.

**Achieved energy is measured in keV.** Most documented beams sit between about 70 keV ([Niell II](https://cyclotroninfo.com/builds/#niell-2), computed from its observed resonance) and about 184 keV (the [Rutgers 9-inch](https://cyclotroninfo.com/builds/#rutgers-9), computed from a run's field and radius); the [Mullins machine's](https://cyclotroninfo.com/builds/#mullins-2017) ≈164 keV is the best-documented figure in that cluster (computed, like the others, from the measured field and the radius at which beam was detected). Two university-lab machines sit above it: the [Rutgers 12-inch](https://cyclotroninfo.com/builds/#rutgers-12) at 800 keV, reached eleven years after the project began, and the [1957 Iowa State undergraduate cyclotron](https://cyclotroninfo.com/builds/#iowa-state-1954), whose 1.5 MeV is its paper's stated maximum with the method of determination unstated. The famous bigger numbers are softer than they look — El Cerrito's “million-electron-volt” machine is a 1947 press claim with no surviving measurement, and the MIT build's 2 MeV design energy has no documented beam behind it. [Choosing your machine](https://cyclotroninfo.com/learn/choosing-your-machine/) draws the design lesson: pick the purpose first and let it set the energy.

**The commonest ending is silence.** 11 of the 27 entries close at “outcome unknown” — the record simply stops before it says what the machine did. Four are postwar school builds known mainly through period press, and the problem did not end with print: the 2007 MIT machine survives as a thesis and two videos, and the 2019 Takanashi build through news coverage of its construction. That decay is why an entry here requires a documented record, and why the sources cited below carry archived copies wherever a snapshot is verified.

## The census in one table

Every machine on one grid, so the pattern shows without reading 27 entries: pole diameters from 150 to 483 mm, fields from 0.19 to 1.7 T on the machines that ran, and energies that are, in nearly every source here, the energy at the radius where beam was detected, computed from the field rather than measured. Two machines have driven nuclear reactions with the beam, both on internal targets: the Rutgers 12-inch makes D–D fusion neutrons at about 500,000 per second on a deuterated target, and Houghton has detected the same reaction. No machine in the census documents an *extracted* beam. Six state outright that the beam stays inside the chamber — the Coburg team give keeping the beam inside as their reason, which limits what escapes but is not the same as a machine producing none — and the rest are silent, which is not the same as no. The nearest thing is the Rutgers 12-inch’s electrostatic deflection channel: real extraction hardware, a 30 kV septum and electrode built in 2009, but pointed at an internal phosphor screen and used as a velocity filter to measure beam energy rather than to bring beam out of the chamber. Extraction hardware is designed more often than it is tested: Knox built an extractor around a deflection plate on a machine that never reached beam, one dee on [The Cyclotron Project](https://cyclotroninfo.com/builds/#cyclotron-project-2018) carries an unused extraction slit, and Coburg — having given keeping the beam in as the reason not to — began building an extraction system with IBA in 2021. The Maryland 19-inch is the only machine here whose published design goal is a beam out of the chamber — joined in intent by the IUAC tabletop, whose director's stated milestone is "We first need to demonstrate beam extraction" — and neither has run yet; [beam extraction](https://cyclotroninfo.com/learn/beam-extraction/) explains why that is the hard step.

| Machine | Start | Builders | Magnet | Ø, mm | Field, T | RF, MHz | Vacuum | Particle | Energy | Current | To beam | Beam | Running |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| [Rutgers 12-inch](https://cyclotroninfo.com/builds/#rutgers-12) | 1995 | undergrad. | recovered | 305 | 0.96 | 7.15 | 9×10⁻⁷ torr | p, d | 800 keV<sup>r</sup> | 200 nA; tens of µA (2012+) |   | ● | ● |
| [Houghton College](https://cyclotroninfo.com/builds/#houghton-2003) | 2001 | undergrad. | lab magnet | 150 | 0.8 | 12.13 | ≈10⁻⁶ torr base | p, H₂⁺, He⁺, d | 157 keV<sup>c</sup> | nA-scale; 100 nA peak | 6 | ● | ● |
| [COLUMBUS Coburg](https://cyclotroninfo.com/builds/#columbus-coburg-2013) | 2012 | high school | donated | 150 | 0.19 | 2.82 | ≈7.5×10⁻⁷ torr | p, H₂⁺ | — | — | 2 | ● | ● |
| [Mullins](https://cyclotroninfo.com/builds/#mullins-2017) | 2017 | individual | built | 203 | 0.58 | 8.87 | ≈6×10⁻⁶ torr | p | 164 keV<sup>c</sup> | 3.2 nA best; 1–2 typical | 1 | ● | ● |
| [Iowa State](https://cyclotroninfo.com/builds/#iowa-state-1954) | 1954 | undergrad. | built | 254 | 1.7<sup>r</sup> | 25.68 | — | p | 1.5 MeV<sup>r</sup> | 2 µA (10 µA peak) | 3 | ● | ○ |
| [Niell I](https://cyclotroninfo.com/builds/#niell-1) | 1993 | high school | built | — | — | 2.25 | unquantified | air (N₂⁺) | — | — | 1 | ● | ○ |
| [Niell II](https://cyclotroninfo.com/builds/#niell-2) | 1994 | high school | built | 178 (chamber) | 0.67<sup>e</sup> | 10 | ≈10⁻⁵ torr | p, He⁺, He²⁺ | 71 keV<sup>c</sup> | — | 1 | ● | ○ |
| [Rutgers 9-inch](https://cyclotroninfo.com/builds/#rutgers-9) | 1995 | undergrad. | surplus | 229 | 0.89 | 13.56 | ≤5×10⁻⁶ torr | p | 184 keV<sup>c</sup> | ≤50 nA | 4 | ● | ○ |
| [Maryland 19-inch](https://cyclotroninfo.com/builds/#umd-19-2016) | 2016 | undergrad. | recovered | 483 | — | — | — | — |   |   |   | ○ | ○ |
| [Cyclotron Project](https://cyclotroninfo.com/builds/#cyclotron-project-2018) | 2018 | individual | built | 356 (dee) | 0.3<sup>d</sup> | 1.5<sup>b</sup> | 10⁻⁵ torr target | p |   |   |   | ○ | ○ |
| [Oyama KOSEN](https://cyclotroninfo.com/builds/#oyama-kosen-2021) | 2021 | KOSEN students | — | — | — | — | — | p (intended) |   |   |   | ○ | ○ |
| [IUAC New Delhi](https://cyclotroninfo.com/builds/#iuac-2024) | 2024 | accelerator lab | Procured to IUAC's design: H-frame water-cooled DC electromagnet, 1.2 T median plane, 305 mm poles, 51 mm nominal gap, 2 × 162 turns at 200 A (tender 09/GOR/2024–25) | 305 | 1.2<sup>d</sup> | 18.2<sup>b</sup> | — | p (intended) |   |   |   | ○ | ○ |
| [Knox College](https://cyclotroninfo.com/builds/#knox-2001) | 1999 | undergrad. | lab magnet | 200 | 2<sup>d</sup> | — | unquantified | p |   |   |   | ○ | ○ |
| [Cyclotron Kids](https://cyclotroninfo.com/builds/#cyclotron-kids-2008) | 2006 | high school | built | 305 (dee) | 1.6<sup>d</sup> | 24<sup>d</sup> | 10⁻⁷ torr (design) | p |   |   |   | ○ | ○ |
| [Kwolik (St. Cloud)](https://cyclotroninfo.com/builds/#kwolik-2015) | 2015 | individual | built | — | 1.2<sup>r</sup> | — | 10⁻⁹ torr (claimed) | — |   |   |   | ○ | ○ |
| [Dawson EMC²](https://cyclotroninfo.com/builds/#dawson-emc2) | 2023 | undergrad. | lab magnet | 300 (dee) | 1<sup>d</sup> | — | — | p, H₂⁺ |   |   |   | ○ | ○ |
| [El Cerrito HS](https://cyclotroninfo.com/builds/#el-cerrito-1947) | 1947 | high school | built | — | — | 20<sup>r</sup> | unquantified | p |   |   |   | ○ | ○ |
| [Howard College Cyclotron](https://cyclotroninfo.com/builds/#howard-1948) | 1948 |   | 16 in poles, 10 tons iron + 2 tons copper, 1/4 in solid-square winding, air-cooled; most materials donated by local industry | 406 | 1.55<sup>d</sup> | — | unquantified | p (intended) |   |   |   | ○ | ○ |
| [Fort Wayne HS](https://cyclotroninfo.com/builds/#fort-wayne-1951) | 1951 | high school | — | — | — | — | — | — |   |   |   | ○ | ○ |
| [Svoboda (Oakland)](https://cyclotroninfo.com/builds/#svoboda-1955) | 1955 | individual | — | — | — | — | — | — |   |   |   | ○ | ○ |
| [Central HS Philadelphia](https://cyclotroninfo.com/builds/#central-high-1958) | 1958 | high school | donated | 178 | 2<sup>e</sup> | 20<sup>e</sup> | ≤10⁻⁶ torr | p (intended) |   |   |   | ○ | ○ |
| [Beeuwkes (Newton)](https://cyclotroninfo.com/builds/#beeuwkes-1958) | 1958 | high school | — | — | — | — | — | e⁻ |   |   |   | ○ | ○ |
| [Seoul National U.](https://cyclotroninfo.com/builds/#snu-1959) | 1959 | graduate students | — | — | — | — | — | p |   |   |   | ○ | ○ |
| [Stuyvesant HS](https://cyclotroninfo.com/builds/#stuyvesant-1962) | 1960 | high school | built | — | — | — | unquantified | — |   |   |   | ○ | ○ |
| [Swank (Anchorage)](https://cyclotroninfo.com/builds/#swank-1967) | 1967 | individual | — | — | — | — | — | — |   |   |   | ○ | ○ |
| [MIT 2 MeV](https://cyclotroninfo.com/builds/#mit-2007) | 2006 | undergrad. | lab magnet | 160 | 2.7<sup>d</sup> | 15.1<sup>b</sup> | 2×10⁻³ torr (test) | p (design) |   |   |   | ○ | ○ |
| [Takanashi (home)](https://cyclotroninfo.com/builds/#takanashi-2019) | 2019 | individual | permanent | — | — | — | — | p |   |   |   | ○ | ○ |

**Field and RF are not always a matched pair.** Where one is a design figure and the other a bench measurement, the two will not satisfy f = qB/2πm — that is the sources' state, not an error here, and the markers say which is which. Hover either value for the specific run or measurement it comes from. 27 machines; 8 produced beam. Energy and current appear only for those 8, and only as the sources report them: <sup>c</sup> marks an energy computed from the measured field and the radius at which beam was detected — the practice in most sources here — <sup>r</sup> an energy the builders report without stating the method, and an unmarked energy has an independent check. Field: <sup>d</sup> design value, <sup>e</sup> the builders’ estimate, <sup>b</sup> a bench measurement of a subsystem rather than a running machine, unmarked measured or operating. Ø is pole diameter unless marked (dee) or (chamber). A dash means the sources do not state it; a blank energy or current means no beam result is documented for that machine — which, for the rows whose outcome is undocumented, is not the same as saying it never produced one. Hover a value for its source page; every row links to the entry and its sources. Click a column heading to sort.

## The programs

Seven of the 27 entries below are not standalone builds but machines belonging to four sustained programs — and the census's clearest pattern is that this is where beam happens. Four of those seven reached beam, against four of the twenty entries that stand alone. The programs also fail differently from individual builds: an individual runs out of money, patience or garage, while a program runs out of *students*. Each of the four has a different answer to that, and the answers are more transferable than any of their specifications. The counter-example is instructive too — the Cyclotron Kids built their machine at a national laboratory with staff support, which is program-shaped in every respect except that nothing followed it.

One thread runs through the census without ever getting a table row of its own: Fermilab. Two of the Fort Wayne 1951 students went on to work there, and [Symmetry's 2010 survey](https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron) names two more employees — Ron Walker and Chris Olsen — who "each built cyclotrons while working there (Olsen actually built three)." Olsen's own account: "I'd worked at the campus particle accelerator lab all four years of college and had built a couple particle accelerators at home … I brought my own cyclotron to my interview here" ([Fermilab, 2015](https://news.fnal.gov/2015/11/one-minute-witrator-operator/)) — and he assisted the Knox build below. None of these personal machines has a recoverable date, place, size or outcome, so they stay here as builders' history rather than machine entries; if a record of any of them surfaces, it earns a row.

### The Koeth lineage — Rutgers, then Maryland

1995 – present · three machines

Begun in 1995 as a personal project by two Rutgers undergraduates, this is the longest continuous amateur-origin cyclotron effort on record and the one that has produced the most physics. A 9-inch prototype built around a surplus NMR magnet demonstrated proton resonance in 1999; a 12-inch machine followed, built around a 4,600 lb magnet recovered from a 1950s laboratory where it had analyzed the extracted beam of a 60-inch cyclotron. From 2001 the 12-inch became the centerpiece of the Rutgers modern physics teaching lab, reliably producing 800 keV protons by 2006 and, after a PIG source upgrade in 2012, tens of microamperes over 30-hour runs. In 2016 it moved to the University of Maryland, where it anchors a capstone design class and a 19-inch successor is being built — the first amateur-origin machine designed to extract its beam.

Its continuity mechanism is the annual student project, and the record reads as a list of them: orbit calculations, weak-focusing pole tips, a two-dimensional field mapper, an RF auto-tuner, an electrostatic deflection channel, spiral-sector azimuthally-varying-field pole tips, a central-region simulation, a measurement of bunch length within a single RF cycle, and most recently fluorine internal targets with a field-insensitive gamma detector. The machine now drives a deuterated target for D–D fusion neutrons at about 500,000 per second, and has been pulsed down to a 10 µs beam-on-target window to measure neutron diffusion time in a moderator. Its builders report that more than a quarter of the students who passed through went on into accelerator physics — which is the output the program is actually optimizing for.

The lineage also propagates in writing. The German COLUMBUS school cyclotron's builders record that their ion source "was built after the pattern of Tim Koeth", citing the project's ion-source memo; India's IUAC tabletop cyclotron is being designed with the 12-inch's builder advising remotely; and the builder's own 2026 project history reports that students elsewhere used the documentation as a model for their own accelerator projects. Two decades of that documentation — construction memos, conference papers, and the neutron-program reports — are collected, with archived fallback links, in the library's Rutgers/Maryland corpus reading guide.

In this census: [Rutgers 9-inch](https://cyclotroninfo.com/builds/#rutgers-9), [Rutgers 12-inch](https://cyclotroninfo.com/builds/#rutgers-12), [Maryland 19-inch](https://cyclotroninfo.com/builds/#umd-19-2016) · [koethcyclotron.org](http://koethcyclotron.org/)

### Houghton College

2001 – present · one machine, twenty years of theses

A deliberately small machine used as a continuing undergraduate research program since 2001. It first accelerated hydrogen ions in 2007 and has since run protons, molecular hydrogen ions, helium and — in 2022 — deuterons, whose run produced a detected D(d,n)³He neutron signal. Beam currents are nanoamp-scale with a peak near 100 nA. It hosted the first amateur cyclotron conference in 2010, which is how several builders in this census first met each other.

Its answer to generational turnover is documentation: roughly twenty theses and conference talks sit in the college repository, each student generation recording what it changed and why, so the next one inherits a written machine rather than a folkloric one. That is also why this entry is among the best-sourced in the census — the comparison table's Houghton row is built almost entirely from student theses. The trade-off the program lives with is that hardware failures have repeatedly interrupted operation, and the thesis record is candid about it.

In this census: [Houghton College Cyclotron](https://cyclotroninfo.com/builds/#houghton-2003) · [Houghton cyclotron papers (institutional repository)](https://dspace.houghton.edu/items/97513cba-fa4d-4228-9deb-7b6a79a5f11e)

### COLUMBUS — Coburg

2012 – present · school project turned university instrument

Started as a school project at the Gymnasium Ernestinum in Coburg, supported from 2012 by the Institute for Nuclear Physics at Forschungszentrum Jülich — which supplied both expertise and a 430 kg magnet — along with Hochschule Coburg and German vacuum industry. It was the first cyclotron built for school and teaching purposes in Europe, and its design was presented at the 2013 international cyclotron conference. The team chose deliberately not to extract the beam, giving as their reason that no harmful radiation should escape during experiments — a design decision worth reading beside the Rutgers entry, where an internal target produces neutrons with no beam leaving the chamber either.

Its continuity mechanism is institutional migration: the machine now lives in the applied vacuum technology laboratory at Hochschule Coburg, where it is used for undergraduate measurements in the technical physics degree and for two or three school workshops a year. Its builders published the design as a short book in 2020 — the only machine in this census with a published teaching text — and a Japanese translation is in preparation with the AxeLatoon collaboration. A school project that became a teaching instrument, then a reference design for other people's programs.

In this census: [COLUMBUS Coburg](https://cyclotroninfo.com/builds/#columbus-coburg-2013) · [Hochschule Coburg](https://www.hs-coburg.de/news/internationales-interesse-an-coburger-teilchenbeschleuniger/)

### AxeLatoon — Japan

2020 – present · eight technical colleges

A program in which students at Japan's technical colleges (高専 / KOSEN) design and build small cyclotrons themselves, mentored by accelerator scientists from KEK, RIKEN and several universities. It chose the cyclotron for two reasons its founders state plainly: the machine is understandable within high-school physics, and one member of the collaboration had already built a small cyclotron at home — so a build procedure was already circulating among the staff. That member's apartment-built machine is an entry in this census, which makes AxeLatoon the clearest case anywhere of a hobby build seeding an institutional program.

Around forty students are active across the sites. Oyama's machine has been operating since January 2023, its detector registering particles as a current while the team works toward an unambiguous first ion-beam observation; Oyama also wrote the reflected-power tuning procedure the other sites now follow. Nagano has its electromagnet and both pumps in hand and waits on an RF source, a chamber and gauges. Toyota, working with vacuum hardware borrowed from KEK, reaches about 1.9&nbsp;×&nbsp;10⁻² Pa in an hour of pumping; its recruiting demonstration puts a tungsten filament, an accelerating electrode and an LED inside a stainless cooking pot, sealed to the vacuum line with bathroom caulk because welding was out of reach, and got to 2.4&nbsp;×&nbsp;10⁻² Pa. The team work the number the way the physics asks: that pressure is a mean free path of about 27 cm, so the filament and the LED need only sit closer together than that. Tsuyama runs accelerator building as a credited course, though its machine is an electrostatic linac and so falls outside this census. Ibaraki's build stopped when its core members reached job-hunting year, and the collaboration names generational turnover as the structural problem for student projects rather than glossing it. Stated ambitions are a nationwide roll-out and a national inter-college accelerator contest. Site-by-site progress is reported in the collaboration's 2025 review in the Journal of Plasma and Fusion Research, linked from the Oyama entry below.

In this census: [Oyama KOSEN](https://cyclotroninfo.com/builds/#oyama-kosen-2021), [Takanashi (home)](https://cyclotroninfo.com/builds/#takanashi-2019) · [AxeLatoon (KEK)](https://www2.kek.jp/axltn/about/)

## Operating today (4)

Machines that reached beam and whose public record runs to the present. What "operating" means varies — a teaching-lab machine on a run schedule, or a program its builders still document as active.

1. ### Rutgers 12-Inch Cyclotron

   Tim Koeth, Stu Hanebuth, and successive Rutgers undergraduates 1995–present

   operated USA 800 keV

   |   |   |
   | --- | --- |
   | Pole diameter | 305 mm (12 in) |
   | Field | 1.2 T (12 kG) design; 0.96 T average measured for the deuteron runs with spiral AVF pole tips |
   | RF frequency | ≈15.1 MHz measured tank resonance; 7.15 MHz for deuterons; 18.3 MHz design at 1.2 T. Note the deuteron pair 7.15 MHz / 0.96 T is ~2% off mutual consistency with f = qB/2πm (7.15 MHz ↔ ≈0.94 T) — both are recorded settings from the 2020 draft, not a validated matched pair |
   | Particle | protons and deuterons (H₂⁺ also observed at reduced field) |
   | Energy | 800 keV, 200 nA demonstrated by 2006; 1 MeV capability; tens of µA after 2012 PIG source upgrade |
   | Extraction | none — the 2009 electrostatic deflection channel (30 kV electrode, stainless septum) turns the beam onto an internal phosphor screen and is used as a velocity filter to measure beam energy |
   | Neutron production | D–D fusion neutrons on a deuterated internal target, ≈5 × 10⁵ n/s during a 5 s continuous run; routine operation is long-pulsed at ≈10% duty factor |

   The best-documented amateur-origin cyclotron: begun as a personal project by two undergraduates in 1995, it became the centerpiece of the Rutgers modern physics teaching lab from 2001, reliably producing 800 keV proton beams by 2006 and, after a PIG ion source upgrade in 2012, tens of microamperes over 30-hour runs. It is also the census's most productive machine as an instrument: tuned for deuterons at 7.15 MHz and 0.96 T with spiral azimuthally-varying-field pole tips, it drives a deuterated internal target to produce D–D fusion neutrons at about 500,000 per second, calibrated against a NIST-traceable ²⁵²Cf source, and has been pulsed down to a 10 µs beam-on-target window to measure neutron diffusion time in a polyethylene moderator. Students have also attempted the ¹⁹F(p,αγ)¹⁶O reaction with fluorine internal targets and a field-insensitive gamma detector. Nineteen undergraduates gained hands-on accelerator experience on the machine, several going on to accelerator-physics careers. In 2016 it moved to the University of Maryland, where it anchors a capstone design class.

   Mined into this site: [201 design rules](https://cyclotroninfo.com/design-guide/?q=Rutgers) extracted from this machine's documentation · [20 library entries](https://cyclotroninfo.com/library/?q=rutgers)

   [Koeth cyclotron site](http://koethcyclotron.org/) [archived Oct 2026](https://web.archive.org/web/20261003220604/http://koethcyclotron.org/) [Dedicated to Training Through R&D (Cyclotrons2013, WEPPT024)](https://proceedings.jacow.org/CYCLOTRONS2013/papers/weppt024.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031332/https://proceedings.jacow.org/CYCLOTRONS2013/papers/weppt024.pdf) [Beam physics demonstrations (Cyclotrons2013, WEPPT025)](https://proceedings.jacow.org/CYCLOTRONS2013/papers/weppt025.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031333/https://proceedings.jacow.org/CYCLOTRONS2013/papers/weppt025.pdf) [Photo gallery: 12-inch cyclotron](http://koethcyclotron.org/?page_id=284) [archived May 2026](https://web.archive.org/web/20260519220314/http://koethcyclotron.org/?page_id=284) [Koeth group (University of Maryland)](https://koethgroup.umd.edu/cyclotron/) [archived Aug 2026](https://web.archive.org/web/20260825015103/https://koethgroup.umd.edu/cyclotron/) [Terp Magazine: Beam Team](https://terp.umd.edu/beam-team) [archived Oct 2026](https://web.archive.org/web/20261003075117/https://terp.umd.edu/beam-team) [Nuclear Physics Lab: neutron diffusion time measurement (D–D neutrons on the 12-inch)](http://www.nuclearphysicslab.com/npl/npl-home/experiments/neutrons/neutron-diffusion-time-measurement/) [archived Aug 2026](https://web.archive.org/web/20260823062648/http://www.nuclearphysicslab.com/npl/npl-home/experiments/neutrons/neutron-diffusion-time-measurement/) [Undergraduate Education with the Rutgers 12-Inch Cyclotron (CAARI 2014 / Physics Procedia 66, 2015)](http://www.nuclearphysicslab.com/npl/wp-content/uploads/CAARI_Koeth_Cyclotron_2.pdf) [archived Aug 2026](https://web.archive.org/web/20260823040347/http://www.nuclearphysicslab.com/npl/wp-content/uploads/CAARI_Koeth_Cyclotron_2.pdf) [Tim's Cyclotron — the builder's thirty-year project history (timkoeth.com, 2026)](http://timkoeth.com/uncategorized/tims-cyclotron/) [archived Oct 2026](https://web.archive.org/web/20261003075112/http://timkoeth.com/uncategorized/tims-cyclotron/) [NPL: 12-Inch Cyclotron Papers (the authors' hosted collection)](http://www.nuclearphysicslab.com/npl/npl-home/accelerators/cyclotrons/12-inch-cyclotron-papers/) [archived Jul 2026](https://web.archive.org/web/20260713123841/http://www.nuclearphysicslab.com/npl/npl-home/accelerators/cyclotrons/12-inch-cyclotron-papers/)

2. ### Houghton College Cyclotron

   Mark Yuly and successive undergraduate students, Houghton College, New York 2001–present

   beam demonstrated USA ≈157 keV

   |   |   |
   | --- | --- |
   | Chamber | 170 mm (6.7 in) inner-diameter aluminium chamber (a post-2008 replacement for the original 149 mm brass ring) |
   | Field | ≈1.1 T (11 kG) |
   | Particle | protons, deuterons, helium ions |
   | Energy | ≈157 keV computed at the highest-frequency run (12.13 MHz, 796 mT, 2013); nanoamp-scale internal beams routine, ≈100 nA peak |
   | Vacuum | diffusion-pumped high-vacuum system |
   | Beam current | nanoamp-scale routine; ≈100 nA peak (2013); ≈20 nA deuterons (2022) |

   A deliberately small cyclotron developed as a continuing undergraduate research program begun in 2001, with each student generation documenting improvements in theses and conference talks — the college repository holds roughly twenty of them. It first accelerated hydrogen ions in 2007 and has since run protons, H₂⁺, helium and, in 2022, deuterons; the deuteron run produced a detected D(d,n)³He neutron signal. Beam currents are nanoamp-scale, peaking near 100 nA, and hardware failures have repeatedly interrupted operation. It hosted the first amateur cyclotron conference in 2010 and remains a teaching and research tool.

   Mined into this site: [119 design rules](https://cyclotroninfo.com/design-guide/?q=Houghton) extracted from this machine's documentation · [8 library entries](https://cyclotroninfo.com/library/?q=houghton)

   [Houghton College cyclotron papers (institutional repository)](https://dspace.houghton.edu/items/97513cba-fa4d-4228-9deb-7b6a79a5f11e) [archived Aug 2026](https://web.archive.org/web/20260823064248/https://dspace.houghton.edu/items/97513cba-fa4d-4228-9deb-7b6a79a5f11e) [Physics Procedia: The Houghton College Cyclotron (2015)](https://www.sciencedirect.com/science/article/pii/S1875389215002369)

3. ### COLUMBUS School Cyclotron

   Ch. Wolf, M. Frank, E. Held and students, Gymnasium Ernestinum, Coburg 2012–present

   operated Germany

   |   |   |
   | --- | --- |
   | Pole diameter | 150 mm (6 in), Bruker BE-15 laboratory magnet |
   | Field | 0.187 T (1.87 kG) at the documented proton run; the 2022 table gives 185 mT for protons and 370 mT for H₂⁺; 0.38 T design point, up to 0.7 T available |
   | RF frequency | 2.82 MHz at 1000 V dee amplitude in the documented run; 5.63 MHz design. Since the matchbox was improved, two frequencies are selectable, 2.82 and 5.64 MHz (the 2022 paper's table gives the lower one as 2.85 MHz, its own text as 2.82) |
   | Particle | protons and H₂⁺, identified by specific charge |
   | Energy | Three published figures, and they are not the same quantity: 24–48 keV design (2013 paper), 8–16 keV as built (builders' 2020 book), and ~4.1 keV for protons / 7.5 keV for H₂⁺ in the 2022 technical-data table. Beam energy has never been measured — particles are identified by specific charge |
   | Vacuum | 10⁻⁶ mbar base and 10⁻⁵ mbar with hydrogen flowing in the 2022 technical data; the 2013 design paper's table gave 10⁻⁵ and 10⁻⁴ mbar |
   | Chamber | 200 mm (7.9 in) diameter × 75 mm high vacuum chamber, built free of charge by VACOM |
   | Ion source | thermionic filament in a Macor chimney with puller electrodes on the dee; 7 A heating, 120 V anode, 2 mA emission, 0.10–0.15 ml/min hydrogen |
   | Detector | home-built Faraday cup on a semi-rigid cable used as a radial guide rod; it reads a few pA to nA, but the experiment evaluates only whether a signal is present, not its magnitude |

   Built as a school project at the Gymnasium Ernestinum in Coburg with a 430 kg magnet and expertise from Forschungszentrum Jülich, which describes it as the first cyclotron built for school and teaching purposes in Europe. The builders date the project to 2012 and first beam to April 2014. Its 2013 conference paper sets out the design: a donated Bruker laboratory magnet, a 120 W marine-band transceiver as the RF source, a Koeth-pattern filament ion source, and a deliberate decision not to extract the beam so that no radiation can leave the experiment — a position the team has since revisited: in August 2021, with help from IBA in Belgium, they began building an extraction system to deflect the beam through a Wien filter and measure the ions' speed and energy against calculation. The machine now lives in the applied vacuum technology laboratory at Hochschule Coburg, where it is described as fully functional and is used for undergraduate measurements and two to three school workshops a year — an amateur-origin machine that became a teaching instrument. Its builders published a short Springer book on the design in 2020, which documents the machine as operated rather than as designed: sweeping the magnet slowly while the Faraday cup sits at a fixed radius records an I(B) spectrum whose first peak, at 187 mT for 2.82 MHz, gives a specific charge within 1% of the proton value, with a second peak identifying H₂⁺. The signal's strength is deliberately not evaluated — the experiment asks which particles are circulating, not how much beam there is, so the machine has no measured beam energy or current. A 2022 conference paper reports the machine as it now stands: a 200 mm × 75 mm chamber, an improved matchbox offering two selectable frequencies, and a base pressure an order of magnitude below the 2013 design figure, alongside the workshop and internship programme built around it.

   [COLUMBUS design paper (Cyclotrons2013, WE1PB03)](https://proceedings.jacow.org/Cyclotrons2013/papers/we1pb03.pdf) [archived Sep 2026](https://web.archive.org/web/20260923221814/https://proceedings.jacow.org/CYCLOTRONS2013/papers/we1pb03.pdf) [COLUMBUS ten years on (Cyclotrons2022, THPO001)](https://proceedings.jacow.org/cyclotrons2022/papers/thpo001.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031321/https://proceedings.jacow.org/cyclotrons2022/papers/thpo001.pdf) [Simulation and detection of the helical ion paths (Cyclotrons2016, MOB02)](https://proceedings.jacow.org/cyclotrons2016/papers/mob02.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031322/https://proceedings.jacow.org/cyclotrons2016/papers/mob02.pdf) [3D printing for high vacuum applications (Cyclotrons2019, THC04)](https://proceedings.jacow.org/cyclotrons2019/papers/thc04.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031322/https://proceedings.jacow.org/cyclotrons2019/papers/thc04.pdf) [Hochschule Coburg: the cyclotron in use (2023)](https://www.hs-coburg.de/news/internationales-interesse-an-coburger-teilchenbeschleuniger/) [archived Aug 2026](https://web.archive.org/web/20260823071753/https://www.hs-coburg.de/news/internationales-interesse-an-coburger-teilchenbeschleuniger/) [Forschungszentrum Jülich on the school project (2014)](https://innovations-report.de/fachgebiete/physik-astronomie/ein-zyklotron-macht-schule) [Prechtl & Wolf, Das Lehr-Zyklotron COLUMBUS (Springer, 2020)](https://link.springer.com/book/10.1007/978-3-658-29710-7) [archived Aug 2026](https://web.archive.org/web/20260823064900/https://idp.springer.com/transit?redirect_uri=https%3A%2F%2Flink.springer.com%2Fbook%2F10.1007%2F978-3-658-29710-7&code=a9d91537-b547-4dc3-b31e-023a274f9f49)

4. ### Mullins Cyclotron

   Simon and Chris Mullins (father and son, home-built) 2017–present

   operated USA ≈164 keV

   |   |   |
   | --- | --- |
   | Field | 580–590 mT typical (582 mT at the ≈164 keV run) |
   | RF frequency | 8.9–9 MHz (8.87 MHz at the ≈164 keV run) |
   | Particle | protons |
   | Energy | ≈150 keV typical operation; ≈164 keV best demonstrated |
   | Beam current | 3.2 nA best (at the ≈164 keV run); 1–2 nA typical |
   | Vacuum | ≈6 × 10⁻⁶ torr while operating |
   | Ion source | hydrogen filament source; H₂ feed through a used 1 sccm mass-flow controller (the one significant upgrade to date) |

   A father-and-son basement build documented on a dedicated project site, carried from magnet design through working machine between 2017 and 2019. Operating at 582 mT with an 8.87 MHz RF system, it demonstrated acceleration of protons to approximately 164 keV. The build log covers the magnet, vacuum system, RF chain, and beam measurements. Status as of August 2026, per the build log: still operational, with over 170 logged runs and the most recent in 2025; typical operation is 1–2 nA of beam at 580–590 mT and 8.9–9 MHz, about 150 keV protons, at roughly 6 × 10⁻⁶ torr — the one significant upgrade to date is a hydrogen delivery system built around a used 1 sccm mass-flow controller.

   [Project build log](https://mullinscyclotron.weebly.com/) [archived Sep 2026](https://web.archive.org/web/20260920044649/https://mullinscyclotron.weebly.com/) [Technical notes and simulation models (hosted on this site)](https://cyclotroninfo.com/library/amateur/#mullins)

## Produced beam, no longer running (4)

Machines that reached beam and whose public record then ends — finished projects, graduated students, dismantled benches.

1. ### Iowa State University Undergraduate Cyclotron

   Undergraduate Physics Club, Iowa State University, Ames — original group led by Clark M. Varnum, advised by D. E. Hudson; later student generations through at least 1963 1954 – at least 1963

   operated USA 1.5 MeV

   |   |   |
   | --- | --- |
   | Pole diameter | 254 mm (10 in) faces, tapered from 12 in stems |
   | Field | 1.7 T (17,000 gauss) |
   | RF frequency | 25.68 MHz, 2 kW |
   | Dee voltage | 10–12 kV dee-to-dee operating; spec table says 10–14 kV |
   | Particle | protons |
   | Energy | 1.5 MeV |
   | Beam current | 2 µA typical; beams up to 10 µA produced |

   A 2.5-ton, 10-inch cyclotron built by Iowa State undergraduates, begun in fall 1954 as a joint project of the Undergraduate Physics Club and the Physics Department laboratory program and first run in spring 1957. It accelerated protons to 1.5 MeV at 2 µA and served a sustained teaching program — undergraduate laboratories, NSF Undergraduate Research Participation, two master's theses, and nuclear work including N-13 production from carbon for half-life measurement. Four Iowa Academy of Science papers document it (McGuire on the machine, Burns on the experimental program, Mueller and Moses on orbit calculations, 1961–1963). McGuire's own scoped claim: 'the first operating “small” machine known to the author which was large enough for serious work in nuclear physics and which at the same time was built and manned essentially by undergraduates.' The machine's fate after 1963 is undocumented.

   [McGuire, The Iowa State University 1.5 Mev Undergraduate Cyclotron (1961)](https://scholarworks.uni.edu/pias/vol68/iss1/65/) [archived Sep 2026](https://web.archive.org/web/20260925001545/https://scholarworks.uni.edu/pias/vol68/iss1/65/) [Burns, Experimental Program with the ISU Undergraduate 1.5 Mev Cyclotron (1961)](https://scholarworks.uni.edu/pias/vol68/iss1/66/) [archived May 2026](https://web.archive.org/web/20260510175842/https://scholarworks.uni.edu/pias/vol68/iss1/66/) [Mueller, Proton Orbit Calculations for the ISU Cyclotron (1961)](https://scholarworks.uni.edu/pias/vol68/iss1/67/) [archived May 2026](https://web.archive.org/web/20260519122903/https://scholarworks.uni.edu/pias/vol68/iss1/67/) [Moses, Proton Orbits in a Small Cyclotron (1963)](https://scholarworks.uni.edu/pias/vol70/iss1/67/) [archived May 2026](https://web.archive.org/web/20260510202509/https://scholarworks.uni.edu/pias/vol70/iss1/67/)

2. ### Niell Cyclotron I

   Fred Niell (high-school student, home-built) c. 1993–1994

   beam demonstrated USA

   |   |   |
   | --- | --- |
   | RF frequency | resonance observed at 2.2–2.3 MHz — reported by the builder as roughly a tenth-order harmonic of the N₂ fundamental, not the fundamental itself |
   | Particle | residual-air ions (mostly nitrogen) |
   | Vacuum | small diffusion pump backed by a rotary pump |

   A cyclotron designed and built at home by a high-school student, set up in the room next to his bedroom, with every component — magnet, RF amplifier, vacuum gauges — of his own construction. Running on residual air rather than an isolated gas species, it demonstrated cyclotron mass resonance with a clear output peak at 2.2–2.3 MHz consistent with nitrogen ions and their harmonics. The associated science-fair project won the grand prize at the 1994 International Science and Engineering Fair.

   [Fred's World of Science: Cyclotron I (archived, with build photos)](https://web.archive.org/web/20200630175247/http://www.niell.org/cyc1.html) [Symmetry: The do-it-yourself cyclotron (2010)](https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron) [archived Aug 2026](https://web.archive.org/web/20260823073602/https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron)

3. ### Niell Cyclotron II

   Fred Niell (high-school student, home-built) 1994–1995

   beam demonstrated USA ≈70 keV

   |   |   |
   | --- | --- |
   | Field | ≈0.67 T (6.7 kG), calculated from turns, current and gap; not measured |
   | RF frequency | 0.5–16 MHz variable; H⁺ resonance observed at 10 MHz |
   | Particle | protons, helium ions |
   | Energy | ≈70 keV computed for H⁺ at the observed resonance (r = 5.7 cm); not measured directly |
   | Vacuum | diffusion pump with molecular-sieve trap |

   A second, more research-oriented machine built the following school year, fixing the shortcomings of the first: a variable-frequency RF system (0.5–16 MHz) driven by a tube push-pull amplifier allowed resonance mapping of more than one ion species. Measured resonance peaks for hydrogen and helium matched prediction within about 2% once the magnet coil count was corrected, corresponding to roughly 70 keV protons. The machine was left at the school when the builder went to college and was later dismantled for parts.

   [Fred's World of Science: Cyclotron II (archived, with build photos)](https://web.archive.org/web/20200630175252/http://www.niell.org/cyc2.html) [Symmetry: The do-it-yourself cyclotron (2010)](https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron) [archived Aug 2026](https://web.archive.org/web/20260823073602/https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron)

4. ### Rutgers 9-Inch Cyclotron (prototype)

   Tim Koeth and Stu Hanebuth, undergraduates at Rutgers University 1995–1999

   beam demonstrated USA

   |   |   |
   | --- | --- |
   | Pole diameter | 229 mm (9 in), Varian V-3400 NMR magnet |
   | Field | 0.889 T (8.89 kG) operating; 1.2 T maximum |
   | RF frequency | 13.56 MHz |
   | Particle | protons |
   | Energy | ≈184 keV computed at 7.0 cm radius (run 91699C); up to ≈50 nA proton current at the chamber periphery |

   The feasibility prototype for the later 12-inch machine, built around a repurposed Varian NMR magnet turned on its side, with a fixed 13.56 MHz industrial-band RF system setting the 0.889 T operating field. Successful resonance runs in 1999 showed a strong proton current at the predicted field, with beam detected at up to about 50 nA at the periphery. Its results justified moving to a 12-inch magnet with a 1 MeV design goal.

   [Koeth cyclotron site: 9-inch prototype](http://koethcyclotron.org/?page_id=80) [archived Aug 2026](https://web.archive.org/web/20260823060852/http://koethcyclotron.org/?page_id=80) [Photo gallery: 9-inch cyclotron](http://koethcyclotron.org/?page_id=239) [archived Aug 2026](https://web.archive.org/web/20260823060537/http://koethcyclotron.org/?page_id=239) [Koeth cyclotron site (main)](http://koethcyclotron.org/) [archived Oct 2026](https://web.archive.org/web/20261003220604/http://koethcyclotron.org/) [Rutgers 12-Inch Cyclotron: Dedicated to Training Through R&D (Cyclotrons2013, WEPPT024)](https://proceedings.jacow.org/CYCLOTRONS2013/papers/weppt024.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031332/https://proceedings.jacow.org/CYCLOTRONS2013/papers/weppt024.pdf)

## Under construction (4)

Active builds with no beam result published yet.

1. ### University of Maryland 19-Inch Cyclotron

   Undergraduate design classes led by Timothy Koeth, University of Maryland c. 2016–present

   in progress USA

   |   |   |
   | --- | --- |
   | Pole diameter | 483 mm (19 in), restored historic magnet |
   | Particle | protons (planned) |
   | Energy | 5 MeV design target per the builder's 2026 project history; no beam yet |

   A successor machine under construction by successive undergraduate cohorts at the University of Maryland, built around a restored 19-inch magnet alongside the relocated Rutgers 12-inch cyclotron. Unlike the 12-inch machine, whose beam stays inside the chamber, the 19-inch design is intended to extract beam for experiments; Terp Magazine reports that on completion it would be the largest cyclotron built by undergraduates.

   [Terp Magazine: Beam Team](https://terp.umd.edu/beam-team) [archived Oct 2026](https://web.archive.org/web/20261003075117/https://terp.umd.edu/beam-team) [Photo log: 19-inch magnet restoration](http://koethcyclotron.org/?page_id=759) [archived May 2026](https://web.archive.org/web/20260519215630/http://koethcyclotron.org/?page_id=759) [Tim's Cyclotron — the builder's thirty-year project history (timkoeth.com, 2026)](http://timkoeth.com/uncategorized/tims-cyclotron/) [archived Oct 2026](https://web.archive.org/web/20261003075112/http://timkoeth.com/uncategorized/tims-cyclotron/)

2. ### The Cyclotron Project

   Reed Michael Upson and Ray Anchordoquy (backyard workshop build) 2018–present

   in progress USA

   |   |   |
   | --- | --- |
   | Dee diameter | 356 mm (14 in) |
   | Field | ≈0.3 T (3 kG) median-plane |
   | Particle | protons |
   | Energy | 60 keV target (revised down from 1.1 MeV, the builders citing incidental radiation) |
   | Vacuum | 10⁻⁵ torr target |

   A two-person build housed in a purpose-built, Faraday-caged garden shed, under way since 2018 and documented on a project site. The original 1.1 MeV goal was deliberately reduced to about 60 keV to avoid incidental radiation hazards. As of the site's last update in late 2024, subsystems including vacuum and the ion source were being validated individually and no beam had yet been produced.

   [Project site](https://thecyclotronproject.github.io/) [archived Aug 2026](https://web.archive.org/web/20260812222652/https://thecyclotronproject.github.io/) [Project photo gallery](https://thecyclotronproject.github.io/Gallery-link/) [archived Aug 2026](https://web.archive.org/web/20260823070456/https://thecyclotronproject.github.io/Gallery-link/)

3. ### Oyama KOSEN Cyclotron

   Oyama KOSEN students (Athena club) with the AxeLatoon collaboration — KEK, RIKEN and university staff 2021–present

   in progress Japan

   |   |   |
   | --- | --- |
   | Design | CST Studio 3D electromagnetic field simulation and particle orbit calculation, done by the students before the chamber was designed |
   | Size | palm-sized (手のひらサイズ) |
   | Particle | protons (intended) |
   | Dee | dee electrode and filament originally fixed by 3D-printed mesh plates, later redesigned once the accelerating field distribution was accounted for |
   | Status | operating since January 2023; the internal detector registers a current the team attributes to particles, with first unambiguous ion-beam observation still pending |

   The first of the AxeLatoon student cyclotrons to reach operation. Twelve first-year students across mechanical, electrical and materials departments began design work in July 2021 with staff from the collaboration, simulating the field distribution and particle orbits in CST Studio before designing the chamber. Chamber fabrication began in spring 2022, with the filament and its drive circuit, the hydrogen system and the other peripherals prepared in parallel; pumps and the RF oscillator were connected around July 2022, and the machine began operating in January 2023. Repeated running has the internal detector registering a current the team attributes to particles, but the team is explicit that the first unambiguous ion-beam observation still needs fine tuning and time. The group also wrote the detailed RF tuning procedure — nulling reflected power — that the other AxeLatoon sites now follow. A deliberately-kept teaching moment: energising the filament before the chamber was evacuated burned it out in about a second and a half, in a very bright flash.

   [Otani et al., Making Accelerators at KOSEN, J. Plasma Fusion Res. 101(5) 226–231 (2025, Japanese)](https://www.jspf.or.jp/Journal/PDF_JSPF/jspf2025_05/jspf2025_05-226.pdf) [archived Dec 2025](https://web.archive.org/web/20251231041557/https://www.jspf.or.jp/Journal/PDF_JSPF/jspf2025_05/jspf2025_05-226.pdf) [AxeLatoon programme (KEK)](https://www2.kek.jp/axltn/about/) [archived Aug 2026](https://web.archive.org/web/20260823073903/https://www2.kek.jp/axltn/about/) [AxeLatoon booklet (Aug 2025, Japanese)](https://www2.kek.jp/axltn/booklet.pdf) [archived Aug 2026](https://web.archive.org/web/20260823202321/https://www2.kek.jp/axltn/booklet.pdf) [Otani, Accelerator construction at KOSEN — AxeLatoon, Hoshasen (放射線) 49(4) 98–101 (2025, Japanese)](https://doi.org/10.11470/houshasen.49.4_98) [archived Oct 2025](https://web.archive.org/web/20251005181448/https://www.jstage.jst.go.jp/article/houshasen/49/4/49_98/_article/-char/ja/) [Kumagai et al., AxeLatoon: the KOSEN exchange meeting, J. Particle Accel. Soc. Japan 21(2) 139–142 (2024, Japanese)](https://doi.org/10.50868/pasj.21.2_139) [archived Jul 2025](https://web.archive.org/web/20250731060519/https://www.jstage.jst.go.jp/article/pasj/21/2/21_210204/_article/-char/ja/)

4. ### IUAC Tabletop Cyclotron

   Inter-University Accelerator Centre staff, New Delhi — from a proposal by P. C. Deshmukh; begun under G. Rodrigues, led by R. Mehta after his retirement; T. Koeth (University of Maryland) advising remotely 2024 – present

   in progress India

   |   |   |
   | --- | --- |
   | Pole diameter | 305 mm (design) |
   | Field | 1.2 T median plane (tender specification) |
   | Pole gap | 51 mm nominal (design) |
   | RF frequency | 18.2 MHz; bench-tested to 200 W, 2 kW CW amplifier in development |
   | Particle | protons (intended) |
   | Energy | 1 MeV (2026 feature) / 1.2 MeV (CAMOST report) — design targets; no beam demonstrated |

   The census's first national-laboratory build: a teaching-scale proton cyclotron under development at India's Inter-University Accelerator Centre since 2024, from a proposal by P. C. Deshmukh that grew out of a 2023 conversation with IUAC's director — with Timothy Koeth of the Maryland 19-inch advising remotely, a documented design lineage from the Rutgers/Maryland educational machines. The paper trail is procurement-grade: a magnet tender specifying 1.2 T on 305 mm poles across a 51 mm gap, an annual report recording two fabricated chambers and a full Dee–dummy-dee RF system, and a conference paper reporting the RF bench-tested to 200 W at 18.2 MHz. Two design energies circulate (1 MeV in the Shaastra feature, 1.2 MeV in the CAMOST report) and neither is a measured beam: no accelerated or extracted beam is documented, and the director's own stated milestone is 'We first need to demonstrate beam extraction.' The feature reports medical-isotope and proton-therapy hopes and an exploratory industry partnership as future directions.

   [“The desktop marvel” — Shaastra (IIT Madras), July 2026](https://shaastramag.iitm.ac.in/special-feature/desktop-marvel) [archived Oct 2026](https://web.archive.org/web/20261003075429/https://shaastramag.iitm.ac.in/special-feature/desktop-marvel) [IUAC magnet tender 09/GOR/2024–25 (design specification)](https://www.iuac.res.in/sites/default/files/tender_files/NIT09GOR.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031324/https://www.iuac.res.in/sites/default/files/tender_files/NIT09GOR.pdf) [IUAC Annual Report 2024–25, ch. 3 (RF system, fabricated chambers)](https://www.iuac.res.in/sites/default/files/annual_report_files/AnnRep_2024_25_Chapter03.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031324/https://www.iuac.res.in/sites/default/files/annual_report_files/AnnRep_2024_25_Chapter03.pdf) [IPAC2026 MOP6698 (RF controller; 18.2 MHz, 200 W test)](https://www.ipac26.org/prepress/pdf/MOP6698.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031324/https://www.ipac26.org/prepress/pdf/MOP6698.pdf) [CAMOST Annual Report 2022–24 (1.2 MeV proposal)](https://www.iisertirupati.ac.in/camost/files/ar_camost_22-24.pdf) [archived Apr 2026](https://web.archive.org/web/20260415194837/https://www.iisertirupati.ac.in/camost/files/ar_camost_22-24.pdf)

## Stalled or dismantled (4)

Projects the record shows stopping before, or after, a beam result.

1. ### Knox College Cyclotron

   Jeff Smith, undergraduate at Knox College, Illinois c. 1999–2001

   stalled USA

   |   |   |
   | --- | --- |
   | Magnet | the college NMR lab's nuclear magnetic resonance magnet, ≈20 cm diameter pole faces, maximum field 2 T |
   | Design energy | 1.5 MeV protons — the design point stated by the department, not a result |
   | Dees | two copper dees on blocks of insulating dielectric, mounted so each could be moved independently |
   | Chamber | 0.48 cm thick brass; the top plate was held on by external air pressure alone, in the pattern Niell used |
   | RF system | the NMR lab's radiofrequency sources and power amplifiers; dees operated at 3,750 V through a manually adjustable resonating circuit. The dees' capacitance was never measured — the circuit was tuned by trial and error |
   | Ion source | coiled coated tungsten filament at the centre of the chamber, its electrons ionising low-pressure hydrogen; built to be completely removable because the builder judged it the design's weak point |
   | Vacuum | 15.2 cm (6 in) diameter diffusion pump; no pressure is published |
   | Feedthroughs | nylon plugs, O-rings and brass screws held in place with Plumber's Goop; rubber stoppers drilled along their axes sealed the gas line and the Faraday collector |
   | Extraction | an extractor system was designed around a negatively charged deflection plate; the machine also carried an insertable Faraday collector plate |
   | Outcome | never successfully tested — the magnetic field moved the wires powering the ion source until they shorted the dees |

   A fixed-frequency cyclotron built as a senior honors project at Knox College, begun the summer before the builder's junior year on a Ford Fellowship and the Richter Fund, after he encountered cyclotrons at a Fermilab public lecture; Fermilab cyclotron builder Chris Olsen assisted. The department states the design point plainly: 1.5 MeV protons, using the 2 T magnet in the college's NMR lab along with that lab's RF sources and power amplifiers. Two independently movable copper dees sat on dielectric blocks inside a brass chamber whose top plate was held down by atmospheric pressure alone; the resonant circuit was tuned by trial and error because the dees' capacitance was never measured; a coiled tungsten filament at the centre ionised low-pressure hydrogen; and both a deflection-plate extractor and an insertable Faraday collector were built. It did not reach beam. A later undergraduate builder at Houghton College, surveying the amateur machines before starting his own, records the failure mode: the magnetic field moved the wires powering the ion source until they shorted the dees. The department's page says he “came very close to seeing beam before graduation rudely cut his project short” and that he left the machine ready for another student to finish; a 2010 account reports it still in the college basement, with one attempt at revival abandoned. The builder went on to a Cornell physics doctorate and to SLAC.

   [Knox College Department of Physics: student projects (cyclotron section, with photographs)](https://departments.knox.edu/physicsdept/Projects/Projects.htm) [archived Aug 2024](https://web.archive.org/web/20240828143902/https://departments.knox.edu/physicsdept/Projects/Projects.htm) [Cressman, The Design and Construction of a Small Cyclotron (Houghton College, 2006) — §1.2.5 surveys this machine](https://dspace.houghton.edu/items/32d64ffe-51a4-49ca-9586-ce63687d061c) [archived Aug 2026](https://web.archive.org/web/20260823201927/https://dspace.houghton.edu/items/32d64ffe-51a4-49ca-9586-ce63687d061c) [Symmetry: The do-it-yourself cyclotron (2010)](https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron) [archived Aug 2026](https://web.archive.org/web/20260823073602/https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron) [Builder profile (SETI Institute)](https://www.seti.org/people/jeffrey-smith/) [archived Aug 2026](https://web.archive.org/web/20260823202256/https://www.seti.org/people/jeffrey-smith/)

2. ### Cyclotron Kids 2 MeV Cyclotron

   Heidi Baumgartner and Peter Heuer (high-school students), with German Diagama; built at Jefferson Lab c. 2006–2013

   stalled USA

   |   |   |
   | --- | --- |
   | Dee diameter | 305 mm (12 in) single dee with grounded dummy dee |
   | Field | 1.6 T (16 kG) design target; the magnet was never power-tested |
   | RF frequency | 24 MHz design, 3 kW tube amplifier (a PlasmaTherm unit retuned from 13.56 MHz) |
   | Particle | protons |
   | Energy | 2 MeV (design) |
   | Vacuum | 10⁻⁷ torr (design) |

   Two high-school students who met at a summer camp in 2006 set out to design a 2 MeV proton cyclotron (their 2013 conference paper gives no year for the decision to build; the project dates itself to 2006) and, after a funding email reached an associate director of Jefferson Lab, were invited to build it at the national lab; construction began in 2009 and ran over several summers. All components — a 1.6 T H-magnet, welded stainless chamber, 24 MHz RF system, and thermionic ion source — were completed, but lab safety rules for minors prevented power testing, and no beam was ever run. The machine was transferred to Old Dominion University to await further student work; both builders went on to physics careers.

   [The Cyclotron Kids project site](https://thecyclotronkids.wordpress.com/) [archived Aug 2026](https://web.archive.org/web/20260812222652/https://thecyclotronkids.wordpress.com/) [Project photo galleries](https://thecyclotronkids.wordpress.com/image-galleries/) [archived Aug 2026](https://web.archive.org/web/20260823070303/https://thecyclotronkids.wordpress.com/image-galleries/) [Cyclotrons2013 paper (WE1PB05)](https://proceedings.jacow.org/CYCLOTRONS2013/papers/we1pb05.pdf) [archived Sep 2026](https://web.archive.org/web/20260928031304/https://proceedings.jacow.org/CYCLOTRONS2013/papers/we1pb05.pdf)

3. ### Kwolik St. Cloud Cyclotron

   James Kwolik, St. Cloud, Minnesota by 2015 (construction years undocumented)

   stalled USA

   An unfinished build documented by the builder's own 2015 photo tour, preserved in this site's library: a 9.25-inch-OD machine with a 1,080 lb magnet carrying commercially machined low-carbon-steel pole tips chamfered for horizontal focusing at 1.2 T, an oil-cooled high-power RF matching network targeting 10–18 kV peak-to-peak on the dees, and a rotary-vane-plus-diffusion-pump stack with an LN₂ cryotrap the account claims reached 10⁻⁹ torr. The machine still needed its 3 kW RF supply and was in storage — which is where the documented record ends. Indexed 2011 construction posts exist on social platforms but could not be retrieved for verification, so the construction years stay undocumented. The serious-hardware, no-RF ending is one of the census's recurring shapes: the magnet is the romance, the RF chain is the wall.

   [Building A 9.25″ OD Cyclotron — the builder's 2015 account (library web capture)](https://cyclotroninfo.com/library/#lib-051)

4. ### Dawson College Mini Cyclotron (EMC²)

   Student-led team of roughly ten CEGEP and undergraduate students (“Engineering a Mini Cyclotron Crew” / BICEPs), Dawson College, Montreal 2023–2025

   stalled Canada

   |   |   |
   | --- | --- |
   | Project | BICEPs — “Bi-Institutional Cyclotron for Experimental Physics”; the college foundation listed it as the “Engineering a Mini Cyclotron Crew” (EMC²). The idea originated as a CERN Beamline for Schools proposal under DawsonHEP and was revived in fall 2023 |
   | Magnet | recovered laboratory electromagnet; now sitting unused in a McGill University physics lab |
   | Design dee diameter | 300 mm |
   | Design field | 1 T |
   | Particles (design) | protons and H₂⁺, from ionised hydrogen |
   | Research output | a betatron-motion and radiation-shielding study, presented at the Canadian Undergraduate Physics Conference 2024 and published in DrJES vol. 15 (Winter 2025) |
   | Outcome | wound down in 2025 as members moved on to university; no construction milestones were published |

   A student initiative at a Montreal CEGEP — BICEPs, the “Bi-Institutional Cyclotron for Experimental Physics”, known to the college foundation as the “Engineering a Mini Cyclotron Crew” (EMC²) — that set out in fall 2023 to build a compact cyclotron and wound down in 2025 as its members moved on to university. The design called for 300 mm dees in a 1 T field, accelerating protons and H₂⁺. The team presented a study of betatron motion and radiation shielding at the Canadian Undergraduate Physics Conference in 2024 and published it in the college research journal in 2025; the recovered laboratory electromagnet now sits unused in a McGill University physics lab. Project history and status per correspondence with a project co-author, August 2026.

   [Dawson College Foundation project page](https://www.dawsoncollege.qc.ca/dawson-foundation/projects/engineering-a-mini-cyclotron-crew/) [archived Aug 2026](https://web.archive.org/web/20260823071604/https://www.dawsoncollege.qc.ca/dawson-foundation/projects/engineering-a-mini-cyclotron-crew/) [Shnoot, Torres & Boukhira, “Optimizing Cyclotron Chamber Geometry”, DrJES vol. 15 (Winter 2025), pp. 4–10](https://www.dawsoncollege.qc.ca/drjes/wp-content/uploads/sites/205/DrJes-Winter-2025-Volume-15.pdf) [archived Sep 2026](https://web.archive.org/web/20260912170542/https://www.dawsoncollege.qc.ca/drjes/wp-content/uploads/sites/205/DrJes-Winter-2025-Volume-15.pdf)

## Outcome undocumented (11)

Projects whose public record stops before any beam result is stated. They may have succeeded, failed, or never been finished; the sources do not say.

1. ### El Cerrito High School Cyclotron

   Four students with physics teacher Ben Siegel, El Cerrito High School, California 1947

   outcome unknown USA

   |   |   |
   | --- | --- |
   | Magnet | ≈0.5 t welded soft-steel double yoke; ≈1 t machine |
   | RF frequency | 20 MHz (reported), ≈1.5 kW |
   | Particle | protons |
   | Energy | “million-electron-volt” claimed in period press; unverified |

   The earliest well-documented school-built cyclotron, constructed in about three months for roughly $500 and featured in Popular Science in 1947 (and, per a later account, in Physics Today). The students operated the machine by remote control from a plywood panel in a closet-sized room, and the Research Corporation waived royalties on the Lawrence cyclotron patents it infringed. Contemporary press reported the machine running at 20 MHz, but no beam measurements survive, so the million-electron-volt figure should be read as a period claim.

   [Popular Science, Nov 1947 (Modern Mechanix scan)](http://blog.modernmechanix.com/boys-build-a-cyclotron/) [archived Oct 2025](https://web.archive.org/web/20251003191226/http://blog.modernmechanix.com/boys-build-a-cyclotron/) [Popular Science article scan (RF Cafe)](https://www.rfcafe.com/references/popular-science/cyclotron-popular-science-november-1947.htm) [archived Aug 2026](https://web.archive.org/web/20260823073221/https://www.rfcafe.com/references/popular-science/cyclotron-popular-science-november-1947.htm) [Symmetry: The do-it-yourself cyclotron (2010)](https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron) [archived Aug 2026](https://web.archive.org/web/20260823073602/https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron)

2. ### Howard College Cyclotron

   W. H. Bancroft, Jr. and Howard College (now Samford University), Birmingham, Alabama — a faculty-led in-house build 1948 – completed by 1959; later scrapped

   outcome unknown USA

   |   |   |
   | --- | --- |
   | Pole diameter | 406 mm (16 in), 4 in centre gap |
   | Field | 15–16 kG (≈1.5–1.6 T) design maximum, air-cooled coils |
   | RF frequency | not stated; four 304TL tubes, 3 kW maximum output (design) |
   | Particle | protons (intended) |
   | Energy | 4 MeV design target; no beam on record |
   | Ion source | Oak Ridge type (design) |

   A faculty-led college build begun in 1948 at Howard College in Birmingham, Alabama — the institution that became Samford University — and still listed as under construction when its builder filled in the June 1958 world-census data sheet, ten years on. Every number on the sheet is a design figure: a 16-inch, 12-ton magnet (10 tons iron, 2 of copper) at 15–16 kilogauss with air-cooled coils, a 21-inch dee driven by four 304TL tubes at up to 50 kV dee-to-dee, an Oak Ridge-type ion source, iron-ore blocks for shielding, and a 4 MeV proton target, at an estimated total cost of $120,000 with most materials donated by local industry. The machine was completed: in 1959 the college paper's science editor described it as operational — the first cyclotron built in Alabama — and after the college's 1957 move it was relocated to the Homewood campus into its own building, where per a Samford physicist it was eventually scrapped; a 1955 photograph survives in the university archives [record extended 2026-09-12 from the Samford campus-history account]. No performance record of any kind has been found — the 1958 sheet's performance page is blank and the 1959 account is a student paper's description, not a measurement — so whether the machine ever produced beam is undocumented and its outcome is recorded as unknown.

   [ORNL-2644 data sheet, printed pp. 119–120 (hosted)](https://cyclotroninfo.com/library/classics/ornl-2644/) [ORNL-2644 at OSTI](https://www.osti.gov/biblio/4286826) [archived Jan 2026](https://web.archive.org/web/20260112153338/https://www.osti.gov/biblio/4286826) [The Secret Beneath Brooks Hall (Samford campus history)](https://secretsofsamford.wordpress.com/2022/09/23/the-secret-beneath-brooks-hall/) [archived Oct 2026](https://web.archive.org/web/20261003075449/https://secretsofsamford.wordpress.com/2022/09/23/the-secret-beneath-brooks-hall/)

3. ### Fort Wayne High School Cyclotron

   Three high-school students, Fort Wayne, Indiana 1951

   outcome unknown USA

   In 1951 three students remodeled their high-school basement into a cyclotron laboratory and were already at work on the accelerator by the time the principal found out. The group kept careful engineering notes that later amateur builders cite as an early blueprint, and two of the students went on to work at Fermilab. No surviving documentation confirms whether the machine ultimately accelerated ions.

   [Symmetry: The do-it-yourself cyclotron (2010)](https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron) [archived Aug 2026](https://web.archive.org/web/20260823073602/https://www.symmetrymagazine.org/article/august-2010/do-it-yourself-cyclotron)

4. ### Svoboda Cyclotron

   Carl Svoboda, 15, Oakland, California 1955

   outcome unknown USA

   A press photograph is the whole surviving record: on 10 March 1955 a Bettmann photographer shot 15-year-old Carl Svoboda 'performing an experiment with a cyclotron (center) he built himself' for about $300 — 'a far cry from the $9,500,000 betatron at the University of California, but an atom-smasher just the same,' the caption says. Contemporary photographic documentation of a completed apparatus, and nothing more: no species, no beam result, no later history. A reader's comment on a 2020 accelerator-history article points to a surviving personal archive — a lead, not a record. Distinct from the El Cerrito High School build across the bay eight years earlier.

   [Bettmann/Getty press photograph and caption, 10 March 1955](https://www.gettyimages.ae/detail/news-photo/boy-with-a-cyclotron-oakland-california-young-carl-svoboda-news-photo/515256936) [archived Oct 2026](https://web.archive.org/web/20261003075515/https://www.gettyimages.ae/detail/news-photo/boy-with-a-cyclotron-oakland-california-young-carl-svoboda-news-photo/515256936)

5. ### Central High School Cyclotron

   Successive student teams (L. Zuckerman, N. Ostroff, J. Horowitz and others; later S. Goldwasser and others), Central High School, Philadelphia 1958 – c. 1970

   outcome unknown USA

   |   |   |
   | --- | --- |
   | Pole diameter | 178 mm (7 in) |
   | Field | ≈2 T (20 kG), a builder’s later estimate; never measured |
   | RF frequency | ≈7 MHz initially, later ≈20 MHz |
   | Particle | protons (intended) |
   | Energy | ≈1 MeV theoretical; no measured beam |

   A cyclotron built and rebuilt by roughly three generations of Philadelphia high-school students between 1958 and about 1970, documented in a detailed retrospective by one of the later participants. The 7-inch machine was theoretically capable of about 1 MeV, but the account itself doubts a real proton beam was ever achieved; the best evidence of operation was a marginal exposure of dental X-ray film.

   [The Central High School Cyclotron (repairfaq.org)](https://www.repairfaq.org/sam/other/chscyc.htm) [archived Aug 2026](https://web.archive.org/web/20260823031813/https://www.repairfaq.org/sam/other/chscyc.htm)

6. ### Beeuwkes Electron Cyclotron

   Reinier Beeuwkes III, 17, Newton High School, Massachusetts 1958

   outcome unknown USA

   The machine that won the 1958 Westinghouse Science Talent Search — and the census's one documented electron cyclotron. The official winners booklet lists 'Design and Construction of an Electron Cyclotron'; Popular Electronics ran the photograph that July: 'He designed and built this cyclotron for accelerating electrons to high speeds. It cost less than $150, and is only as complex “as a radio,” he says, but it netted the 17-year-old Newton, Mass., lad a $7500 science scholarship.' TIME's account gives $121. No operating figures, achieved energy, or technical description survives in the located record — a classical cyclotron geometry accelerating electrons stays nonrelativistic only to a few keV, and what the machine actually demonstrated is exactly what the missing technical account would have said. Status is therefore unknown, on a machine good enough to win the country's top school science prize.

   [1958 Science Talent Search winners booklet (project listing)](https://sspcdn.blob.core.windows.net/files/Documents/Alumni/STS/1958_Semifinalist_Book.pdf) [archived Mar 2026](https://web.archive.org/web/20260315205104/https://sspcdn.blob.core.windows.net/files/Documents/Alumni/STS/1958_Semifinalist_Book.pdf) [Popular Electronics, July 1958, p. 34 (photo and account)](https://archive.org/stream/Pop195710/Popular%20Electronics/Pop-1958-07_djvu.txt) [TIME, March 1958](https://time.com/archive/6800617/education-two-for-the-money/) [archived Jul 2025](https://web.archive.org/web/20250708131012/https://time.com/archive/6800617/education-two-for-the-money/)

7. ### Seoul National University Cyclotron

   Graduate students and faculty, SNU physics department — the official account credits Kwon Young-dae and his students 1959–60

   outcome unknown South Korea

   Korea's first domestically built accelerator, by the official account: the Korean Academy of Science and Technology's merit biography of physicist Kwon Young-dae states that in 1959 'Korea attempted for the first time to independently manufacture a cyclotron, and a proton beam was successfully extracted.' That extraction claim is a retrospective biography sentence, not a technical record — no measurement, collection point, or commissioning account survives in located sources, so the claim is reported here as the biography's and the status stays unknown. A 2025 builder memoir (mirrored online, not independently verified) describes a 20 cm chamber and a 2.5-ton magnet; a 1961 paper title reportedly gives the machine's designation as 1.5 MeV, and a 1962 companion paper on its vacuum chamber says 1 MeV — designations, not measurements. A funded graduate project rather than a hobby build; it enters this census the way the IUAC machine does, as a documented student-built machine with its scope stated plainly. The biography's own verdict: the machine was small and did not lead to sustained research, but showed a generation of students that experimental physics could be done in Korea.

   [Korean Academy of Science and Technology merit biography: Kwon Young-dae](https://www.koreascientists.kr/scientists/merit/merit-list/?boardId=bbs_0000000000000028&category=2024&cntId=96&mode=view&pageIdx=) [archived Jun 2026](https://web.archive.org/web/20260615145054/https://www.koreascientists.kr/scientists/merit/merit-list/?boardId=bbs_0000000000000028&category=2024&cntId=96&mode=view&pageIdx=)

8. ### Stuyvesant High School Cyclotron

   Student Cyclotron Committee, Stuyvesant High School, New York City early 1960s

   outcome unknown USA

   Stuyvesant students organized a Cyclotron Committee with specialized teams for the electromagnet, vacuum chamber, and RF system, collecting donations that included a half-ton of steel and five miles of copper wire at a project cost of roughly $10,000. A 1962 school publication suggested the machine was completed, but a retrospective in the school's own newspaper found no evidence the project actually reached completion.

   [The Stuyvesant Spectator retrospective](https://stuyspec.com/science/that-time-stuyvesant-students-built-a-particle-accelerator) [archived Aug 2026](https://web.archive.org/web/20260823070141/https://stuyspec.com/science/that-time-stuyvesant-students-built-a-particle-accelerator)

9. ### Swank First Cyclotron

   Albert Swank Jr., 17, with his father, Anchorage, Alaska c. 1967

   outcome unknown USA

   The teenage build behind the census-adjacent story everyone knows. Albert Swank Jr. reached national news in December 2005 for arranging to move a 20-ton Johns Hopkins medical cyclotron into his Anchorage home — and NPR's report notes, almost in passing, that the family building 'is the same building where he built a smaller cyclotron when he was 17,' his father working 'side by side with me while I was building my first cyclotron.' Swank was 55 at the time of the report, which puts the build around 1967 — an inference from the reported ages, not a documented date. Nothing else survives in the located record: no specifications, no beam result. The two machines are recorded separately — this entry is the 1960s build; the 2005 relocation project has its own record on the world map.

   [NPR: Neighborhood Up in Arms Over Home Cyclotron (Dec 2005)](https://www.npr.org/2005/12/08/5044104/neighborhood-up-in-arms-over-home-cyclotron) [archived Sep 2025](https://web.archive.org/web/20250926002107/https://www.npr.org/2005/12/08/5044104/neighborhood-up-in-arms-over-home-cyclotron)

10. ### MIT 2 MeV Cyclotron Project

    Leslie Dewan, undergraduate at MIT c. 2006–2007

    outcome unknown USA

    |   |   |
    | --- | --- |
    | Particle | protons |
    | Energy | 2 MeV (design) |

    An undergraduate thesis project documenting the design and construction of a cyclotron intended to accelerate protons to 2 MeV for low-energy beam experiments in MIT's nuclear engineering department. The thesis and two videos are the surviving public record; no demonstrated beam is documented, and the project appears not to have been completed.

    [MIT thesis (DSpace@MIT)](https://dspace.mit.edu/handle/1721.1/41681) [archived Aug 2026](https://web.archive.org/web/20260812222653/https://dspace.mit.edu/entities/publication/8c6cfc70-8654-4677-9f05-38a0473b31c3) [Project video (YouTube)](https://www.youtube.com/watch?v=Yd-i9YU_xZQ) [archived Aug 2026](https://web.archive.org/web/20260823075552/https://www.youtube.com/watch?v=Yd-i9YU_xZQ) [Project video, part 2 (YouTube)](https://www.youtube.com/watch?v=1JmpU5ChaoA) [archived Aug 2026](https://web.archive.org/web/20260823073732/https://www.youtube.com/watch?v=1JmpU5ChaoA)

11. ### Takanashi Home Cyclotron

    Takaoki Takanashi (高梨宇宙), Japan c. 2019

    outcome unknown Japan

    |   |   |
    | --- | --- |
    | Magnet | permanent magnet beneath the chamber, ≈¥150,000 — half the budget |
    | Chamber | self-designed, fabricated to order (≈¥100,000); the first design used a non-standard vacuum flange spec, found only after fabrication |
    | Ion source | hot tungsten filament ionising hydrogen admitted to the evacuated chamber; the filament is threaded through a 0.45 mm hole hand-drilled in 0.8 mm copper wire under a watchmaker’s loupe |
    | Dee | single hollow semicircular brass dee |
    | RF system | secondhand, sourced from online auctions and eBay; final hardware suggested by an amateur-radio friend |
    | Detection | metal rod intended to collect accelerated protons and read them as a current; no reading has been published |
    | Particle | protons |
    | Cost | ≈¥300,000 total (roughly US$2,000–2,800 at 2019 rates) |

    A tabletop classical cyclotron built in an apartment living room by a theoretical particle physicist with no experimental or engineering training, who bought a lathe and a milling machine and worked by trial and error — reading papers and manufacturer catalogues to choose hardware, and buying most of it secondhand. Machine shops initially refused the vacuum chamber job, suspicious that no individual would build such a thing, before one agreed; the finished chamber then turned out to use a non-standard flange spec. The builder is explicit that the machine is not for experiments: building it was the point, and he chose a cyclotron over a fusor because fusor instructions are already all over the internet, leaving no trial and error. He exhibited it at Maker Faire Tokyo in 2019, where a RIKEN colleague explained the physics to the press, and states that he designed, built and got the machine running. No beam energy, current, field or frequency has been published, so what it achieved is undocumented. He went on to build a Wideröe-type linear accelerator in the same room — the machine he exhibited at Maker Faire Tokyo in 2022 — and his machine became the seed for a national student cyclotron programme (see AxeLatoon, below). He is a researcher at RIKEN, and the programme's own record has him introducing the home cyclotron to first-year students at Oyama KOSEN in November 2021 and the home linac at Nagano KOSEN a month later. Both posts describe him presenting the machines and taking questions, not running them; no measurement from either occasion is published.

    [ITmedia NEWS: the self-built particle accelerator (2019, Japanese)](https://www.itmedia.co.jp/news/articles/1908/09/news063.html) [archived Aug 2026](https://web.archive.org/web/20260823071842/https://www.itmedia.co.jp/news/article/1908/09/1190809063/) [Maker Faire Tokyo 2019 exhibitor page](https://makezine.jp/event/makers-mft2019/m0066/) [archived Aug 2026](https://web.archive.org/web/20260823201923/https://makezine.jp/event/makers-mft2019/m0066/) [Maker Faire Shenzhen: Meet the maker (2021, English)](https://www.shenzhenmakerfaire.com/2021/10/13/meet-the-maker-diy-particle-accelerator/) [archived Aug 2026](https://web.archive.org/web/20260823073709/https://www.shenzhenmakerfaire.com/2021/10/13/meet-the-maker-diy-particle-accelerator/) [Zaikei Shimbun: built at home for about ¥300,000 (2019, Japanese)](https://zaikei.co.jp/article/20190813/525784.html) [archived Mar 2021](https://web.archive.org/web/20210310040633/https://www.zaikei.co.jp/article/20190813/525784.html) [AxeLatoon: Maker Faire Tokyo 2020, with the Wabi-Sabi Phys. Lab. interview (KEK, Japanese)](https://www2.kek.jp/axltn/posts/2020/279/) [archived Aug 2026](https://web.archive.org/web/20260823202337/https://www2.kek.jp/axltn/posts/2020/279/) [AxeLatoon: introducing the home cyclotron at Oyama KOSEN, 10 Nov 2021 (Japanese)](https://www2.kek.jp/axltn/posts/2021/314/) [archived Aug 2026](https://web.archive.org/web/20260823202524/https://www2.kek.jp/axltn/posts/2021/314/) [AxeLatoon: introducing the home linac at Nagano KOSEN, 20 Dec 2021 (Japanese)](https://www2.kek.jp/axltn/posts/2021/354/) [archived Aug 2026](https://web.archive.org/web/20260823202511/https://www2.kek.jp/axltn/posts/2021/354/) [Maker Faire Tokyo 2022 exhibitor page — the Wideröe linac (Japanese)](https://makezine.jp/event/makers-mft2022/m0075/) [archived Nov 2025](https://web.archive.org/web/20251123224640/https://makezine.jp/event/makers-mft2022/m0075/)

Know of a documented build that is missing here? Additions with sources are welcome via the contact address on the [About](https://cyclotroninfo.com/about/) page.

> **Page provenance.** Last reviewed: 22 August 2026 · 27 documented machines, compiled from published build records · [Methodology](https://cyclotroninfo.com/about/methodology/) · [Report a correction](mailto:info@cyclotroninfo.com?subject=Correction%3A%20Amateur%20Builds) · [Changelog](https://cyclotroninfo.com/changelog/)
